国产午夜理论不卡在线观看,激情欧美一区二区三区中文字幕,色一情一交一乱一区二区,欧美综合亚洲日韩精品区一

<strong id="haxz0"><strong id="haxz0"><pre id="haxz0"></pre></strong></strong>

    1. <var id="haxz0"><track id="haxz0"><ins id="haxz0"></ins></track></var>
      <rp id="haxz0"></rp>

      Contact Us

      ADD: 16 Tongyi Road, Weihai City, China

      TEL: 86-0631-5233588

      FAX: 86-0631-5224345

      Lubumbashi Water Supply Project

      Completion date: Aug. 2015
      Project Introduction:
       The project is located in Lubumbashi, Demoncratic Republic of Congo, and the project is financed by the World Bank. The project includes four new pumping stations, renovation of three existing pumping stations, 11 new drilling wells, the new main pipeline 62,395 meters, second-level and third-level pipes 204,264 meters, supplying water to 12,426 households, 100 four-head public water points, installing 10 sets transformer control cabinets and setting up 8m medium-voltage cable.
      Delivery Method: General construction contracting

      Copyright:Weihai International Economic & Technical Cooperative Co., Ltd.(c) Address :16 Tongyi Road, Weihai City, China  Lu ICP, number 12002982, -3 TEL:86-0631-5233588  FAX:86-0631-5224345  Lu public network security 37100202000269Number  Technical Support:Aosion