      Current Location:Home > Engineering Case > Airports

      Lome International Airport

      Completion date: Jun. 2015 (Phase I)
      Project introduction:
      The project is located in Lome, capital of Togo. It is the most important airport in the Country. The project includes the new construction of an airport terminal; the extension of 500m runway; the reconstruction of existing runway and runway drain; the renovation and extension of energy and airfield lighting system, navigation and meteorological equipment, transformer substation, parking apron; the reformation and extension of freight warehouse; and the extension of taxiway, etc. The new terminal building area of 25580 square meters (with viaduct).
      Delivery Method: EPC general contracting